Risk Register Best Practices
A risk register is the central document for tracking all identified risks throughout the project lifecycle. This guide covers best practices for creating and maintaining an effective register.
What is a Risk Register?
A risk register (or risk log) is a document that records:
- All identified risks
- Their assessment (probability, impact, score)
- Planned responses
- Current status
- Ownership and actions
It serves as the single source of truth for risk information on the project.
Risk Register Structure
Essential Fields
Every risk register should include these core fields:
| Field | Description | Example |
|---|---|---|
| Risk ID | Unique identifier | R-001 |
| Date Raised | When first identified | 2026-01-15 |
| Risk Description | Clear statement of the risk | “Key developer may leave mid-project” |
| Category | Type of risk | Technical, Resource, External |
| Probability | Likelihood (1-5) | 3 |
| Impact | Consequence (1-5) | 4 |
| Score | P x I | 12 |
| Response Strategy | Avoid/Mitigate/Transfer/Accept | Mitigate |
| Response Actions | Specific planned actions | Cross-train team members |
| Owner | Person responsible | John Smith |
| Status | Current state | Open |
| Target Date | When actions due | 2026-02-01 |
Additional Useful Fields
| Field | Description | When Useful |
|---|---|---|
| Trigger | Warning sign risk is occurring | Complex risks |
| Contingency Plan | Fallback if risk occurs | High-impact risks |
| Contingency Budget | Reserve allocated | Financial risks |
| Date Last Reviewed | When last assessed | All projects |
| Proximity | How soon could it occur | Time-sensitive risks |
| Secondary Risks | Risks from response | Complex responses |
| Residual Score | Score after response | Measuring effectiveness |
RAID Log Integration
Many projects use a combined RAID log to track related items:
| Component | Description | Status When Resolved |
|---|---|---|
| Risks | Uncertain events that may occur | Closed / Occurred (becomes Issue) |
| Assumptions | Things assumed to be true | Validated / Invalid |
| Issues | Problems that have occurred | Resolved / Escalated |
| Decisions | Key decisions made | N/A (record only) |
When to Use RAID vs Separate Logs
| Approach | Best For |
|---|---|
| Combined RAID | Small-medium projects, integrated tracking |
| Separate Logs | Large projects, different owners for each |
Writing Good Risk Descriptions
The Risk Statement Format
Use a structured format for clarity:
IF [cause/event] THEN [consequence]
Or:
Due to [cause], there is a risk that [event] which would result in [impact]
Good vs Poor Risk Descriptions
| Poor Description | Better Description |
|---|---|
| “Resource risk” | “Key developer may leave before code complete, causing 4-week delay” |
| “Budget might be exceeded” | “Due to unclear requirements, scope creep may occur, resulting in 15% budget overrun” |
| “Technology issues” | “If the new API is incompatible with legacy systems, integration will fail” |
| “Vendor problems” | “Supplier may not deliver hardware by March, delaying user testing” |
Risk Categories
Organise risks into categories for easier management:
| Category | Examples |
|---|---|
| Technical | Technology, integration, complexity, dependencies |
| Resource | Skills, availability, capacity, retention |
| Schedule | Dependencies, delays, lead times, approvals |
| Cost | Estimates, inflation, currency, funding |
| Scope | Requirements, changes, creep, ambiguity |
| Quality | Defects, standards, testing, acceptance |
| External | Suppliers, regulations, market, competitors |
| Organisational | Priorities, restructuring, sponsorship |
Review Cadence
Regular Reviews
| Review Type | Frequency | Purpose |
|---|---|---|
| Risk owner check-in | Weekly | Update status of owned risks |
| Team risk review | Fortnightly | Discuss active risks, identify new ones |
| Steering committee | Monthly | Report top risks, seek decisions |
| Stage/phase gate | At milestones | Comprehensive reassessment |
What to Review
At each review:
- Are probability/impact scores still accurate?
- Have any risks occurred (become issues)?
- Are response actions progressing?
- Are there any new risks?
- Should any risks be closed?
- Do any risks need escalation?
Risk Reporting
Top Risks Summary
Include in regular status reports:
| Rank | Risk | Score | Trend | Response | Owner |
|---|---|---|---|---|---|
| 1 | Key developer departure | 16 | ↑ | Mitigate | JSmith |
| 2 | Supplier delivery delay | 12 | → | Transfer | PJones |
| 3 | Scope creep | 12 | ↓ | Mitigate | MBrown |
Trend indicators:
- ↑ Increasing (worsening)
- → Stable
- ↓ Decreasing (improving)
Risk Heat Map Report
Visual summary showing risk distribution:
| Low I | Med I | High I | |
|---|---|---|---|
| High P | 1 | 2 | 0 |
| Med P | 3 | 4 | 1 |
| Low P | 5 | 2 | 1 |
Common Mistakes
1. Set and Forget
- Problem: Register created once and never updated.
- Solution: Schedule regular reviews, assign owners, track status.
2. Too Vague
- Problem: Risks like “things might go wrong”.
- Solution: Use structured risk statements with cause, event, and impact.
3. Too Many Risks
- Problem: Hundreds of risks, impossible to manage.
- Solution: Focus on significant risks, consolidate similar ones, use thresholds.
4. No Ownership
- Problem: Risks exist but nobody is responsible.
- Solution: Every risk must have a single owner accountable for monitoring and response.
5. Score Inflation/Deflation
- Problem: Inconsistent scoring across assessors.
- Solution: Use defined scales, calibrate as a team, reference examples.
6. Missing Actions
- Problem: Response strategy chosen but no concrete actions.
- Solution: Every mitigated/avoided risk needs specific, dated actions.
7. Ignoring Opportunities
- Problem: Only tracking threats, missing positive risks.
-
Solution: Include opportunities with appropriate response strategies.
Risk Register Tools
| Tool | Best For | Pros | Cons |
|---|---|---|---|
| Spreadsheet | Small projects | Simple, accessible | Limited collaboration |
| SharePoint List | Team collaboration | Shared access, views | Setup required |
| Jira/Azure DevOps | Agile projects | Integrated, workflow | May be overkill |
| Dedicated PM Tool | Enterprise | Full features, reporting | Cost, complexity |
Template Download
Download our RAID log template to get started:
Download RAID Log Template (XLSX)
Checklist: Is Your Risk Register Effective?
- Every risk has a unique ID
- Descriptions follow a clear format
- Probability and impact are scored consistently
- Every risk has an owner
- Response strategies are documented
- Actions have deadlines
- Register is reviewed regularly
- Closed risks are archived, not deleted
- Stakeholders can access the register
- Top risks are reported to steering committee
Related Resources