Change Readiness Assessment — Interactive
You need a defensible number to put in front of a leader who has already picked the date
Score the Change Readiness Assessment on screen. It does the weighting for you, applies the stop signals, and — more usefully — tells you how to present the result, because leading with the total invites an argument about the instrument rather than the substance.
A low score is not a reason not to proceed. It is a list of what to fix first, and a defensible piece of evidence when you need to tell a leader the date is wrong.
Everything stays in your browser. Nothing is uploaded, and your answers are saved to this device as you type.
The basics
Score each statement 1 (not at all) to 5 (fully true). Score honestly — the value is in the sections you score badly.
A · Sponsorship weight ×3
Weighted heaviest because active, visible sponsorship is repeatedly identified as the single largest contributor to change success. If A is under 15 weighted, fix this before anything else.
| # | Statement | Score |
|---|---|---|
| A1 | There is one named senior sponsor, not a committee | |
| A2 | The sponsor can explain the change in their own words, without notes | |
| A3 | The sponsor has done something visible about it in the last month | |
| A4 | The sponsor's peers are publicly aligned — no visible dissent at that level | |
| A5 | The sponsor will still be in post in 12 months |
B · Clarity
| # | Statement | Score |
|---|---|---|
| B1 | We can name the specific behaviours that must change | |
| B2 | We know who has to change them, by role | |
| B3 | We have evidence — not assumption — of what's blocking them | |
| B4 | We know what people will stop doing to make room | |
| B5 | We can say what success looks like without using a milestone |
C · Capacity and saturation
If C is under 12, the most valuable advice you can give a senior leader is sequence or stop something.
| # | Statement | Score |
|---|---|---|
| C1 | The affected teams are not already absorbing a major change | |
| C2 | Managers have time to lead this, not just forward emails | |
| C3 | There is resource for the sustain phase, not just go-live | |
| C4 | Nothing significant lands on these teams in the next quarter | |
| C5 | We know how many other initiatives are live for these people |
D · Trust and history
Low D is the hardest to fix and the most often ignored. If it is low, acknowledge the history out loud, early.
| # | Statement | Score |
|---|---|---|
| D1 | The last major change here was seen as successful by the people affected | |
| D2 | Commitments made during previous changes were kept | |
| D3 | People believe they can raise concerns without cost | |
| D4 | This isn't a rebrand of something that was tried before and failed | |
| D5 | The reason for the change is credible, not obviously a cover story |
E · Design quality
If E1 or E4 is 1–2, you have a design problem masquerading as a change problem. Say this before launch.
| # | Statement | Score |
|---|---|---|
| E1 | The new way is genuinely better for the person doing it, not just for the org | |
| E2 | People who do the work were involved in designing it | |
| E3 | It has been tested under realistic pressure, not just demoed | |
| E4 | The new way is easier than the old way at the point of use | |
| E5 | We can make the new way the default |
Notes and evidence
Take it with you
Re-run this after your fixes and keep both copies — showing the movement is far more persuasive than a single score.